Do you deliver power works (LV and MV) for companies, industry and sites?
Yes. We implement LV and MV power installations for commercial buildings, warehouses, production halls and industrial sites. For smaller projects we also cover apartment buildings and selected residential installations.
Can you work while the facility is operating (with minimal shutdown)?
Yes. We plan work in stages and handle critical cutovers during agreed outages (night/weekend). The approach is designed to minimize operational impact while keeping safety at the highest level.
What typically falls under ‘power distribution’ for a commercial facility?
Building supply and main feeders, switchboards and sub-distribution, supplies for technology, protections (breakers, RCD/SPD), grounding/bonding, and the required measurements and protocols for handover.
Do you handle LV service connections and main feeders as part of the scope?
Yes. Connections and main feeders determine capacity reserve and reliability. We handle sizing, routing, interface to switchboards and a clean handover with documentation.
Can you also deliver MV scope (MV cables, substations, site connection)?
Yes. MV work is planned with safety and operational regime in mind. We set a clear procedure, control points and handover outputs so commissioning runs smoothly.
Do you design and manufacture switchboards and then install/commission them on site?
Yes. We design and manufacture switchboards and can continue with installation, wiring and handover. The advantage: one team, unified documentation and clear responsibility.
How do you ensure selectivity so a fault doesn’t shut down more than necessary?
We structure the installation so faults trip as close to the source as possible. Circuit logic, protection selectivity and cable sizing are designed for stability and fast service.
Do you handle grounding, bonding and surge protection (SPD)?
Yes. Earthing and bonding are handled system-wide (MET/HOP, machinery, structures). Surge protection is designed based on risk and interfaces to switchboards and lightning protection.
Is documentation and inspection support part of the delivery?
Yes. Clear labeling and as-built documentation are standard. We can follow with initial/periodic inspections and prepare inputs so the handover is safe and unambiguous.
What do you need for a fast quote?
A short brief is enough (facility type, scope, loads, environment, location, deadline and operational constraints). If you have schematics or photos of switchboards, it improves accuracy. Then we propose steps and milestone timing.